FACILITIES PLAN ITJ VALLE REAL
Dear ITJ Valle Real community
We want to share with you a vision that we have been cultivating with dedication and commitment: an improvement plan, designed taking into account the suggestions and criteria of our ITJ community, which will further strengthen the educational experience of our students and the entire community, responding to current and future needs.
Below, we present the spaces where we are working, along with the benefits that this will bring as a result.
soccer and bleachers with shade:
Playground
renewed in primary
New building
for Middle School
in High School areas
New shades will be placed so that, during their leisure time, students have cooler and more comfortable outdoor areas for rest and study. In addition, picnic tables will be installed on the high school terraces, creating ideal spaces for living together, working as a team or simply relaxing outdoors.
WHATS
NEXT?
We are proud to share with you the progress of the new building. We are currently working on the final details of painting, gates and doors.
The development of the building is carried out in 3 phases
First phase (in the process of completion): includes 9 fully equipped classrooms, 3 offices on the ground floor and bathrooms, with the purpose of offering our students and academic staff safe, comfortable spaces ready to start activities.
Second phase (to be completed during the first semester): will contemplate the opening of the second floor, where a laboratory will be integrated makers, a science laboratory, a technology laboratory and a new cafeteria. With this, our students will have innovative and specialized environments that encourage practical learning, creativity and coexistence.
Third phase (to be developed in the future): an additional block of classrooms will be added on the second floor, which will allow us to expand academic capacity and continue growing in accordance with the needs of our educational community.
Relining of fields: We have already completed the relining of the large and small soccer fields, which now have renovated grass and offer better conditions for sports practice.
Shades on stands They will offer greater comfort and protection to enjoy sporting events.
Playground renovado: The plank/base is now ready to receive new games designed to encourage motor skills and dexterity, including fun spinning games and interactive structures. We hope to debut it with our students in September.
Shades and picnic tables on terraces of Preparatory Installed since August 28, for a cooler and more pleasant atmosphere during break times.
We know that the trust of our community is our greatest support, which is why we share this plan with transparency and enthusiasm, aware that each step must be supported by careful and responsible execution.
These transformations not only improve our facilities, but also strengthen our educational promise of developing well-rounded, global and excellent students. At ITJ Valle Real we believe that investing in our facilities is investing in the future of our community.
We will continue working so that every corner of our campus inspires, motivates and supports the growth of our students. Thank you for joining us on this path of growth.